EVALUASI KELAYAKAN TEKNIS SISTEM PEMBANGKIT LISTRIK TENAGA DIESEL DI PT. BANUA LIMASEJURUS (BALIMAS) BANJARMASIN

Penulis

  • Rachmat Subagyo Penulis
  • Sigit Mujiarto Penulis
  • Adi Muttaqin Penulis

Kata Kunci:

diesel power plants, engine, system, feasibility

Abstrak

Diesel power plants in PT BALIMAS has operated for more than 15 years. with the longer operates the system will decrease reliability. This requires an evaluation of the technical feasibility of diesel power in the company. Things will be evaluated on a diesel power plants include: the load on the system, the efficiency of diesel engines, diesel engines, generators, fuel systems, lubrication systems, cooling systems, and air intake systems. The entire system must be either a diesel generator and can meet the needs of electric power quality, effective and efficient as needed. From the preparation of this final duty is taken to a conclusion based on value of the company's 64.95% demand factor, load factor 50%, 35.8% efficiency of diesel engines, diesel fuel consumption 0.2287 liters / kwh, oil consumption 0.0025 liters / kwh , radiator water consumption 46.9 liters / kwh, water cooling tower consumption 31.269 liters / kwh and the total air required 2.707 m³ / sec it can be concluded that the diesel power generation system worth to keep operating.

Unduhan

Diterbitkan

2018-04-09